Prime Minister inspects progress on the national exhibition center project in Hanoi

5:21 PM, Mon May 19, 2025

Prime Minister Pham Minh Chinh on May 19 checked on the progress of the construction site of the National Exhibition and Fair Center project in Dong Anh District.

Prime Minister inspects progress on the national exhibition center project in Hanoi- Ảnh 1.

The overview of the National Exhibition and Fair Center in Dong Anh District.

Prime Minister Pham Minh Chinh on May 19 checked on the progress of the construction site of the National Exhibition and Fair Center project in Dong Anh District.

The National Exhibition and Fair Center is a strategic project in the trade and service sector, intended to replace the former exhibition center on Ba Dinh District's Giang Vo Street.

Construction began in late August 2024, with a planned area of 90 hectares, making it one of the ten largest exhibition centers in the world.

The complex is expected to become a new landmark of the capital and a hub for a dynamic "Expo economy," comparable to other global trade centers.

Located at the northeastern gateway of Hanoi, the site sits at the heart of a planned transportation network that includes major roads, air routes, and metro lines.

The indoor exhibition building is the centerpiece of the project, divided into nine zones, each covering more than 10,000 square meters, along with a central hall of over 7,000 square meters.

Supporting the indoor exhibition areas are modern functional facilities designed to accommodate exhibitions across all sectors.

Surrounding the complex are lakes and green spaces, offering a peaceful and refreshing outdoor environment.

Complementing the main exhibition halls are four outdoor exhibition parks, covering a total area of 20.6 hectares, and making them the second largest of their kind in the world and the largest in Asia.

These parks are designed to host large-scale events, exhibitions, festivals, and cultural tourism activities, either individually or simultaneously.

During his visit, Prime Minister Pham Minh Chinh expressed satisfaction with the energetic pace of construction.

He praised the efforts of ministries, agencies, the Hanoi administration, and Vingroup Corporation.

Just eight months after groundbreaking, the large-scale, modern international-standard center has begun to take shape and is on track for completion as scheduled, he said.

Remaining components, including exterior roofing, glass façades, indoor exhibition halls, mechanical and electrical systems, and auxiliary facilities, must be completed in time for the National Exhibition on Socio-Economic Achievements, to be held in celebration of the 80th anniversary of National Day, PM Chinh said.

At a working session held directly on-site with ministries and project stakeholders, the Prime Minister called for accelerated construction to ensure the center is ready in time for the country's major commemorative events: the 80th anniversary of the August Revolution (August 19, 1945 – August 19, 2025) and National Day (September 2, 1945 – September 2, 2025).

Looking ahead, Chinh directed that the center, located in Co Loa – the hometown of General Secretary Nguyen Phu Trong, should be developed as a new symbol of Hanoi and Vietnam.

He emphasized that it must reflect national stature through its scale, culture, architecture, environmental landscape, and management, and highlight the country's achievements after 40 years of renewal.

The prime minister envisioned the center as a leading destination for culture, art, tourism, and services, and a place that fosters the development of the cultural and entertainment industries and serves as a regional and global exhibition hub.

He emphasized that the public should benefit from this space by enjoying both domestic and international cultural and artistic achievements.

The center should be a site where Vietnam embraces the cultural achievements of humanity, and where the nation shares its unique cultural identity with the world, Chinh said.

The Prime Minister instructed that, alongside the main exhibition structures, all supporting facilities, services, and utilities must be completed in a coordinated manner.

Infrastructure such as roads, electricity, water, telecommunications, and other modern systems must be fully integrated, and the environmental landscape must be preserved and enhanced, he added.

Prime Minister inspects progress on the national exhibition center project in Hanoi- Ảnh 2.

Prime Minister Pham Minh Chinh talks with contractors and local authorities on ensuring the project be completed as planned.

PM Chinh also set a deadline for substantial completion of construction by the end of July 2025.

To ensure effective implementation, Prime Minister Chinh assigned Deputy Prime Minister Mai Van Chinh to oversee the project.

He tasked the Ministry of Culture, Sports and Tourism with establishing a detailed timeline and a clear division of responsibilities, following the principle of "clear assignment of people, tasks, accountability, deadlines, outcomes, and authority."

PM Chinh also requested the ministry to finalize the plan for organizing the National Exhibition on Socio-Economic Achievements for the 80th National Day, ensuring full participation from all ministries, sectors, and localities.

The event should also feature large-scale cultural, artistic, and performance activities, serving as the launch for future major cultural events, he said.

The Prime Minister approved in principle the application of special policies and mechanisms for the National Exhibition Center.

He noted that, if necessary, international consultants with expertise in organizing large-scale events could be hired. At the same time, Vietnam must develop its own teams to absorb knowledge and technology.

He stressed a strong commitment to progress: "Only talk about doing, not stepping back. What has been promised must be delivered. What has been committed must be fulfilled. What has been implemented must yield tangible results and products."

Ring Road 4 expressway project kicks off in Noi Bai Commune

16:17 06/09/2025

The groundbreaking ceremony took place in Noi Bai Commune. This project is part of the Ring Road 4 – Capital Region scheme.

Most views
Same category
Find by date
Hanoi ensure effective administrative procedures
Hanoi ensure effective administrative procedures
Following the Prime Minister's direction at the third meeting on July 20, 2025, Hanoi has acted decisively, carried out tasks in a synchronized manner, and achieved notable results in science, technology, innovation, digital transformation, administrative reform, and Project 06.
15:49 29/09/2025
Memorial site for former Head of NA Standing Committee Bui Bang Doan opens
Memorial site for former Head of NA Standing Committee Bui Bang Doan opens
The Hanoi People's Committee, in coordination with the Office of the National Assembly, on the morning of September 28 held the Inauguration Ceremony of the Memorial Site dedicated to Bui Bang Doan, Standing Committee Chairman of the National Assembly, at the Bat Chua communal cultural house in Ung Thien commune.
16:42 28/09/2025
Hanoimoi Newspaper Run for Peace 2025 attracts over 3,000 participants
Hanoimoi Newspaper Run for Peace 2025 attracts over 3,000 participants
The finals of the 50th Hanoimoi Newspaper Run for Peace 2025 on the morning of September 28 took place in front of Ba Kieu Temple and around Hoan Kiem Lake's pedestrian zone. The event was co-organized by the Hanoi People's Committee, Hanoimoi Newspaper, and the Hanoi Department of Culture and Sports.
15:23 28/09/2025
Hanoi receives first Labor Order
Hanoi receives first Labor Order
The Hanoi Party Committee, People's Council, People's Committee and Vietnam Fatherland Front Committee on September 26 held a ceremony to announce the Government's decision recognizing Hanoi as having completed the New Rural Development (NRD) program in 2024 and to award the First-Class Labor Order to the Party, government, and people of the capital.
15:26 26/09/2025
Elderly to play active role in Vietnam's new era
Elderly to play active role in Vietnam's new era
The Hanoi Association of the Elderly, in coordination with the People's Committee of Cua Nam Ward and DND International Eye Hospital, on the morning of September 25 launched the "Action Month for Vietnamese Elderly 2025" and introduced the program "Bright Eyes for the Elderly" for the 2025–2028 period in Hanoi.
15:35 25/09/2025
Hanoi break-grounds of AEGIS International Hospital project
Hanoi break-grounds of AEGIS International Hospital project
T'Hospital Co., Ltd. and VINACONEX Corporation on the morning of September 25 held a groundbreaking ceremony for the AEGIS International Hospital in Yen So Ward. Attending the ceremony were Prof. Dr. Tran Van Thuan, Deputy Minister of Health, and Phung Thi Hong Ha, Standing Committee member of the Hanoi Party Committee and Permanent Vice Chairwoman of the Hanoi People's Council.
15:34 25/09/2025
Other news
Hanoi set to host Autumn Fair 2025
Hanoi set to host Autumn Fair 2025
Vice Chairman of the Hanoi People’s Committee Nguyen Manh Quyen has signed Official Dispatch No. 5394/UBND-DT dated October 2, 2025, on coordinating the organization of the Autumn Fair 2025.
16:40 02/10/2025
Hanoi to hold artistic program marking 65th anniversary of Vietnam-Cuba relations
Hanoi to hold artistic program marking 65th anniversary of Vietnam-Cuba relations
Vice Chairman of the Hanoi People's Committee Nguyen Manh Quyen has signed Official Dispatch No. 5405/UBND-KGVX dated October 2, 2025, on organizing an art program celebrating the 65th anniversary of diplomatic relations between Vietnam and Cuba (December 2, 1960 – December 2, 2025).
16:35 02/10/2025
Hanoi boosts cultural industry development
Hanoi boosts cultural industry development
Standing Vice Chairman of the Hanoi People's Committee Le Hong Son has signed Plan No. 270/KH-UBND dated October 1, 2025, to implement Resolution No. 24/2025/NQ-HDND issued on July 10, 2025, by the Hanoi People's Council.
16:40 01/10/2025
Hanoi launches cultural and commercial development zones
Hanoi launches cultural and commercial development zones
Standing Vice Chairman of the Hanoi People's Committee Le Hong Son has signed Plan No. 271/KH-UBND dated October 1, 2025, to implement Resolution No. 25/2025/NQ-HDND issued on July 10, 2025, by the Hanoi People's Council on establishing cultural and commercial development zones across the city.
16:35 01/10/2025
Hanoi steps up environmental controls along To Lich River Basin
Hanoi steps up environmental controls along To Lich River Basin
The Hanoi People's Committee Office has issued Official Dispatch No. 15245/VP-NNMT dated September 25, 2025, on strengthening controls to ensure environmental sanitation in the To Lich River basin.
17:03 25/09/2025
Hanoi to host 2025 International Craft Village Festival
Hanoi to host 2025 International Craft Village Festival
Vice Chairman of the Hanoi People’s Committee Nguyen Manh Quyen has signed Official Letter No. 5242/UBND-NNMT on September 24, approving the city’s participation in the 2025 International Craft Village Conservation and Development Festival.
16:49 24/09/2025
Hanoi launches
Hanoi launches "digital stalls" to boost local traders
Vice Chairman of the Hanoi People’s Committee Truong Viet Dung has signed Plan No. 256/KH-UBND, dated September 23, 2025, to implement the program “Digital Stalls – Elevating Capital Traders” aimed at expanding the role of the digital economy in the city’s GRDP.
16:59 23/09/2025
Hanoi tightens control over drugs, cosmetics and health foods
Hanoi tightens control over drugs, cosmetics and health foods
Vice Chairwoman of the Hanoi People’s Committee Vu Thu Ha has signed Plan No. 255/KH-UBND, dated September 22, 2025, outlining a thematic program to strengthen oversight of the production and trading of medicines, cosmetics, and health supplements in the capital next year.
16:50 22/09/2025